One of the advantages of pole barns is the speed of construction. Unlike traditional building that can take months, a pole barn can be completed in weeks. Here's what to expect at each stage of the process.
Phase 1: Planning and Permitting (2-8 weeks)
Before construction begins: Finalize building design and specificationsObtain permits (varies by Washington county)Prepare site and order materialsSchedule foundation installationPhase 2: Foundation Work (1-2 weeks)
Your foundation must be complete and cured before building delivery: Site clearing and gradingForms and reinforcement installationConcrete pour (1 day)Curing time (5-7 days minimum before erection)Phase 3: Manufacturing (2-6 weeks)
Once your order is placed and permits are approved: Engineering drawings finalizedMaterials fabricated to specificationsQuality inspection and loadingShipping coordinationPhase 4: Delivery and Erection (1-2 weeks)
The exciting part—watching your building take shape: Materials delivery (usually 1-2 days)Columns and rafters installation (1-2 days)Roof and wall panels (1-3 days)Trim and accessories (1-2 days)Final inspection From deposit to completion, most projects take 6-12 weeks. Weather can impact the timeline—rain can delay foundation work and erection. Planning ahead and having all materials ready before erection begins ensures the fastest possible completion. In Western Washington, we recommend planning around the driest months (June-September) for optimal scheduling.Related Articles
PM
buying-guide
Pole Barn vs Traditional Construction: Cost Comparison
Discover why pole barns are increasingly preferred over traditional wood construction. Compare costs, timelines, durability, and long-term value for Washington buildings.
Jan 5, 2024
2 min read
PM
buying-guide
Permitting Requirements for Pole Barns in Washington
Navigate Washington permitting requirements with confidence. Learn what permits you need, how to get them, and common pitfalls to avoid.
Dec 20, 2023
1 min read
Ready to Start Your Project?
Get a free quote on your metal building project. No obligation, no pressure.